helloProject Modelling
Architecture
hello
Architecture
hello
Stage 2
Massing of the Model
Massing Models of New and Existing Buildings
Importing Site and Landscape Models
Importing MEP and Structural Models
Indicative Site Survey Information
Indicative or Specialist Survey Tree Information
Indicative or Specialist Survey Tree Information
Indicative or Specialist Survey Tree Information
LOD 2/LOI as per NBS Toolkit - Does not include build-up
Identify requirements at this stage by MDTP
Floor and Wall elements - Does not include build-up
Door and Window elements - Does not include build-up
Indicative proposed Building location
Indicative or Specialist Survey Tree Information
Stage 3
Building Model
Massing Models of New and Existing Buildings
Importing Site and Landscape Models
Importing MEP and Structural Models
Setup / Acquire Shared Coordinates
Indicative or Specialist Walls and Floors Information
Indicative or Specialist Doors and Windows Information
Indicative or Specialist Survey Tree Information
LOD 3/LOI as per NBS Toolkit
FFE - Furniture, Fixtures and Equipment
Identify requirements at this stage by MDTP
Floor and Wall elements - Does not include build-up
Door and Window elements - Does not include build-up
Precise Building Location
Stage 4
Building Model
Massing Models of New and Existing Buildings
Importing Site and Landscape Models
Importing MEP and Structural Models
Setup / Acquire Shared Coordinates
Indicative or Specialist Walls and Floors Information
Indicative or Specialist Doors and Windows Information
Importing Specialist Subcontractor Models
LOD 4/LOI as per NBS Toolkit - Include build-up
FFE - Furniture, Fixtures and Equipment
Identify requirements at this stage by MDTP
Floor and Wall elements - Include build-up
Door and Window elements - Include build-up
Precise Building Location
Overview
Highlights
Compatibility
Mobilisation/Precautionary - One (1) Week.
Modelling - Estimation Time varies according to Project scale and complexity.
Development Landscape BIM Projects.
No Documents/Drawings/Sheets included.
All our Revit models are BIM Level 2 Compliant.
HAE Revit Template and Content Pack are not included for all Modelling Stages.
Modelling - Estimation Time varies according to Project scale and complexity.
Development Landscape BIM Projects.
No Documents/Drawings/Sheets included.
All our Revit models are BIM Level 2 Compliant.
HAE Revit Template and Content Pack are not included for all Modelling Stages.
The price will be estimated based on project size and complexity.
HAE is an Online Company, and we exclusively provide remote consultancy.
Quotation and Contract will be sent via email after agreed on the Project Terms.
Revit 2019 - 2023
helloProject Modelling
Landscape
hello
Landscape
hello
Stage 2
Digital Terrain Model
Massing Models of New and Existing Buildings
Importing Architectural building Models
Importing Civil and Structural Models
Indicative or Specialist Survey Tree Information
Indicative or Specialist Survey Tree Information
Indicative or Specialist Survey Tree Information
LOD 2/LOI as per NBS Toolkit - Does not include build-up
Identify requirements at this stage by MDTP
Hard Landscape elements - Does not include build-up
Soft Landscape elements - Does not include build-up
Indicative proposed Trees location
Indicative or Specialist Survey Tree Information
Stage 3
Digital Terrain Model
Massing Models of New and Existing Buildings
Importing Architectural building Models
Importing Civil and Structural Models
Indicative or Specialist Survey Tree Information
Indicative Transport Systems, importing utility information
Indicative or Specialist Survey Tree Information
LOD 3/LOI as per NBS Toolkit
FFE - Furniture, Fixtures and Equipment
Identify requirements at this stage by MDTP
Hard Landscape elements - Does not include build-up
Soft Landscape elements - Does not include build-up
Indicative proposed Trees location
Stage 4
Digital Terrain Model
Massing Models of New and Existing Buildings
Importing Architectural building Models
Importing Civil and Structural Models
Importing Specialist Subcontractor Modelss
Indicative or Specialist Survey Tree Information
Indicative Transport Systems, importing utility information
LOD 4/LOI as per NBS Toolkit - Include build-up
FFE - Furniture, Fixtures and Equipment
Identify requirements at this stage by MDTP
Hard Landscape elements - Does not include build-up
Soft Landscape elements - Does not include build-up
Indicative proposed Trees location
Overview
Highlights
Compatibility
Mobilisation/Precautionary - One (1) Week.
Modelling - Estimation Time varies according to Project scale and complexity.
Development Landscape BIM Projects.
No Documents/Drawings/Sheets included.
All our Revit models are BIM Level 2 Compliant.
HAE Revit Template and Content Pack are not included for all Modelling Stages.
Modelling - Estimation Time varies according to Project scale and complexity.
Development Landscape BIM Projects.
No Documents/Drawings/Sheets included.
All our Revit models are BIM Level 2 Compliant.
HAE Revit Template and Content Pack are not included for all Modelling Stages.
The price will be estimated based on project size and complexity.
HAE is an Online Company, and we exclusively provide remote consultancy.
Quotation and Contract will be sent via email after agreed on the Project Terms.
Revit 2019 - 2023
Contact
Details
Details
Architects and Landscape Requests:
bim@haeconsultants.com
Other Services:
Interior Design/Product Design/R&D
info.haeconsultants@gmail.com
HAE Landscape Ltd.
71-75, Shelton Street, London, WC2H 9JQ
Registered in England no. 12532938
bim@haeconsultants.com
Other Services:
Interior Design/Product Design/R&D
info.haeconsultants@gmail.com
HAE Landscape Ltd.
71-75, Shelton Street, London, WC2H 9JQ
Registered in England no. 12532938